Dry-in done right, on your build schedule.

New construction roofing isn’t a repair job, it’s a coordination job. No tear-off, no working around an existing structure, just getting the roof system installed correctly and on schedule so the next trade can move in behind us. Billings Roofing works directly with builders, GCs, and homeowners building custom across Oklahoma, Arkansas, and Missouri.

Top Roof Replacement Company

Oklahoma · Arkansas · Missouri

200+ Five-Star Reviews

Google · Facebook · BBB

Locally Owned & Operated

Family business since day one

Licensed & Insured

All three states · GAF Master Elite in OK & AR

Get Started

Request a Free 360° Estimate

No pressure. No obligation. Just honest answers.

Free · No Obligation · 24hr Response

5-Star
Reviews

0 +

GAF Master
Elite Contractor

Top 0 %

Family Owned
Roofing Company

# 0
Why Homeowners Call Us

What Builders Need From Us

What Slows Builds Down

  • Framing delays that push the roofing window
  • Penetration conflicts with HVAC, plumbing, or electrical rough-in
  • Ventilation or underlayment specs that don’t pass inspection the first time
  • Material lead times that threaten a closing date
  • Custom roof lines that need real planning, not a standard template

How We Keep You On Schedule

  1. Pre-build site meeting to review roof line, ventilation, and penetration plan
  2. Material ordering timed against your framing schedule, not ours
  3. Installation scheduled to complete dry-in before the next trade needs access
  4. Code-compliant systems built to pass inspection the first time
  5. Photo documentation handed over for your records and the homeowner’s
  6.  

Built to Code, Every Time

Getting the roof wrong on a new build doesn’t just mean a callback, it means a failed inspection and a delayed closing. We build to current code on ventilation, underlayment, and flashing every time, and we document it.

The Details

What's included

Every project we take on is completed to the same high standard — whether it’s a small repair or a full replacement. Here’s what you can expect when you work with us.
No shortcuts. Ever.
How We Work With Builders

Working With Your Builder

Most roofing problems on new builds aren't roofing problems, they're coordination problems. A roofer who shows up without talking to the framing crew first ends up fighting penetration locations that were never planned for. We don't work that way.

One Meeting. No Surprises.

Before materials get ordered, we sit down with your builder or GC to walk the roof line, confirm ventilation strategy, and map out where HVAC, plumbing, and electrical need to come through. That one meeting usually prevents most of the change orders that slow other jobs down.

Pre-build coordination directly with your GC or site superintendent
Scheduling built around framing completion, not a fixed calendar date
Material delivery timed to avoid job site clutter or delay
One point of contact throughout, not a rotating crew
The Process

How it works

1

Pre-Build Consultation

We review roof line, ventilation strategy, and penetration planning with your builder before anything is ordered.

 

2

Installation & Dry-In

Our crews complete the roof system so the next trade can move in without delay.

 

3

Material & Schedule Planning

Materials are ordered and delivery is timed against your actual framing schedule.

 

4

Final Walkthrough & Warranty Handoff

We walk the completed roof, document everything, and hand over a warranty that transfers cleanly to the homeowner.

Common Questions

Frequently asked

We coordinate directly with your builder or GC and schedule installation around framing completion, not a fixed date on our calendar. New construction also skips the tear-off phase, so it typically installs faster than a comparable replacement.

 

Yes, that’s most of what makes new construction roofing go smoothly. We handle scheduling, material timing, and inspection coordination directly with your GC or site super.

 

Impact-resistant architectural shingles are the most common choice given local hail exposure. Standing seam metal is a strong option for a longer service life, and tile or slate can work on architecturally compatible custom homes at a higher cost.

 

Yes. The manufacturer and workmanship warranties transfer cleanly to the homeowner at closing.

 

Most new installs run 1 to 3 days depending on size and roof line complexity. Custom homes with complex rooflines may take longer.

 

We build to current code on ventilation, underlayment, and flashing, and provide documentation your inspector can reference directly.

Ready to Begin?

Get your free estimate today

No pressure, no obligation. Just an honest assessment from a team that takes pride in every roof we touch.